Request for Quotes (RFQ) for the Supply of Service- Borehole Rehabilitation at Ekklesiyar Yan’uwa a Nigeria (EYN PROJECT)

EYN Projects respects and believes in the infinite worth of every individual. We demonstrate this belief through our development and humanitarian services to affected communities, equal employment opportunities, building and strengthening staff’s skills, and ensuring qualitative and effective service delivery. EYN Projects does not discriminate based on gender, ethnicity, or religion in our recruitment exercise nor in our humanitarian and development work.

  • Experience 2 years
  • Location Borno

REQUEST FOR QUOTES (RFQ) FOR THE SUPPLY OF SERVICE- BOREHOLE REHABILITATION 

“RFQ N0:  EYNPN/CAID/WASH/MAFA/TENDER/AUGUST/2025/0394 “REHABILITATION OF BOREHOLES”

CLOSING DATE: 23rd October 2025, 5:00 PM

LOCATION: MAFA LGA AND NGWOM, BORNO STATE

                                           ITEM / DISCRIPTION              UNIT    QUANTITY
Rehabilitation of Borehole 1 at Ngwom as on Bill of Quantity attachedEach1
Rehabilitation of Borehole 2 at Mafa Central Primary School as on Bill of quantity attachedEach1
Rehabilitation of Borehole 3 at Mafa as on Bill of Quantity attachedEach1
   
   
   
    

To be considered, bidders should submit a complete quotation not later than the closing date and time indicated above. Bidders should ensure that the quotation is well written in English, easy to read, follows the instructions provided, and contains only requested information.

QUESTION: Any questions should be submitted in writing and emailed to [email protected]no later than two days after the issue date of this RFQ. No questions will be entertained if they are received by means other than the specified email address, and any communications to alternate e-mail addresses will result in the disqualification of the bidder.  The solicitation number (listed above) should be stated in the subject line. Answers will be compiled and distributed within 1 day from the closing date of questions

The Bidder is required to include details of three business references; this should include the name, company, and relationship to the bidder, email address, and / or phone number for each reference.

EYN Projects reserves the right to visit the place of business of a prospective supplier to verify that it is a legal business entity and has the necessary organizational and management competence to fulfill the necessary responsibilities.

  • All Bidders must provide proof of registration and tax. Attach CAC certificate, TIN Certificate and updated Tax Clearance Certificate when sending quotation.
  • All transportation and handling charges if any should be incorporated into vendor’s quoted unit price.

DISCLAIMER: – Brand Names: Specific brands and / or models indicated—while often preferred—are for description only.  An equivalent substitute, as determined by the specifications, will be acceptable.

The EYN projects estimates that the Borehole rehabilitation will be completed within a period of 10 working days. The selected bidder(s) should have the capacity to rehabilitation needed by EYN projects within the aforementioned timeframe. The consumption range provided is an estimate, and EYN projects reserves the right to consume above or below this range, or to order partial Items, and the selected bidder(s) shall deliver accordingly. The selected bidder(s) must deliver the Service according to the provided timeline.

TENDER REQUIREMENTS:  – To ensure that best value is obtained the following would be considered;

  1. Evidence of Vendor’s registration with CAC, Tax Identification number and updated Tax Clerance (Certificates) and other relevant certificates-SCUML
  2. Acceptable quotation validity period
  3. Availability of items
  4. Delivery within specified time
  5. Proof of experience
  6. three business references; this should include the name, company, and relationship to the bidder, email address, and / or phone number for each reference.
  7. Quotation is applicable to 2% withholding tax and 1% Stamp duty.

EVALUATION CRITERIA: BEST VALUE (Technical Specification 40%, Delivery Time 30%, Price reasonableness 30%): – Only quotations that meet the requirement above would be selected for evaluation. Please note that if there are significant deficiencies regarding responsiveness to the requirements of this RFQ, an offer may be deemed “non-responsive” and thereby disqualified from consideration. EYN Projects reserves the right to waive immaterial deficiencies at its discretion. EYN and its Donor reserves the right to access vendor’s procurement document in case of any misconduct

BOQ FOR THE REHABILITATION OF NGWOM SOLAR POWERED BOREHOLE IN MAFA LGA, BORNO STATE, NIGERIA.
 DESCRIPTION OF WORKSUNITQUANTITY COST  TOTAL COST 
1Mobilization and Demobilisation (Establishment of a base Station): Mobilization of all necessary materials, equipment, and all personnel to the base station for site clearance, borehole developments, pumping test and recovery tests, civil works, and installation of motorized pumps; including demobilisation of all Plants, Equipment’s and all resources from sits upon completion of installation works.Lumpsum1                                                            
2Allow for data analysis and writing reports (Borehole completion reports, pump test report, installation report) in two hard copies and 1 electronic copy.Lumpsum1                                                                 
 Total carried to summary: MOBILIZATION                              
      
CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL
AEARTH WORK    
1Site Clerance: Clear and and remove all tres, shrubs, and obstacle to be disposed 100m away from the site. m224.5                                                                    
2Excavate for the Foundation to receive concrete work not exceeding 700mm depthm35.23                             
3Backfilling  to the sides of the excavated foundation footing using selected excavated materials to achieve maximum campaction ratio.m31.87  
4Remove surplus excavated material away from the sitem30.93                                
5Excavation of soak pitnot exceeding 1.5m from natural ground level as specified on the drawingsm317.85  
6Provide hardcore material to the floor site of the water pointm29.4                                                               
 SUBTOTAL                              
CONCRETE WORK    
1Provide and place 50mm thick plain concrete to ratio 1:3:6 grade 10 for foundation trench as specified on the drawing and specification.m30.85                                                             
2Plastering/Rendering of water point using ratio 1:3m211.25                                                                    
3Ditto: Apronm35.66                                                                    
4 Provide mass cocrete to the ramp using ratio 1:3:6 m3                         0.27                                                                
5Reinforced concrete cover slab to ratio 1:2:4 grade 15m30.26                           
6Ditto: Apronm20.5                                                             
 SUBTOTAL                              
CREINFORCEMENT    
              1 High yield steel deformed bars to BS4449    
              2 Provide and fixed Y 12mm Ø reinforcement bar for soak pit slabKg37                                                                  
              3 Binding wireKg1                                                                        
 SUBTOTAL                              
 D FORMWORK    
              1  Provide 2″x4″ hard wood timber to the sides of slab  pcs                          4.80                                                                
              2  3″ assorted nails  kg                          1.00                                                                       
 SUBTOTAL                              
EMASONRY WORK    
1 Provide and lay 230mm thick hollow blocks of 1:3 mix ratio  enbedded and jointed to cement sand mortar(1:4) to the perimeter and Apron of the water point ncluding ramp and 3 metre drainage channel connecting collection point and soak pit m2                       17.92                                                                
2 Sand cement plastering/rendering of 20mm thick, finished smooth: To internal & external fence walls. m2                       12.87                                                                   
3 Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the soak pit allowing maximum of 3 opening to sides od the pit for proper seapage m2                       14.20                                                                
4 50mm thick concrete blinding to ratio 1:3:6 grade 10 for soak pit m3                         0.31                                                                
5 Block fill the block using week concrete m3                         2.24                                                                
 SUBTOTAL                            
FSTEEL WORK     
1Provide and fixed 1 1/4″ diameter pure black circular hand rail to the both sides of the ramp as shown on the drawingm                       29.20                                                                
 SUBTOTAL                              
F Plumbing work     
1Provide and fix UPVC 1″ UPVC tigger elbow Nr                               2                                                                     
2Provide and fix 3/4″ steel tap head England made or as specified by the engineer Nr                               6                                                                
3 Provide and fix 3/4″ UPVC tigger nipple Nr                               6                                                                  
4Provide and fix 3/4″ UPVC tigger socket  Nr                               6                                                                  
5Provide and fix  1″ by 3/4″ Bushing England made or as specified by the engineer  Nr                               6                                                                  
6 Provide and fix 1″ UPVC tigger pipe in the collection point and extend aleast 2m away from the collection point  Nr                               2                                                                  
7 Provide and fix 1″ UPVC stop cork regulator at the collection point  Nr                               1                                                              
 SUBTOTAL                              
Total carried to summary – CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL                           
 Total carried to summary – CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL FOR 2 UNITS 2                          
      
BOQ: For Solar Installation 1,150 Watts System
1Supply and Install pump type SQ flex (1.5 Hp) determined by yield and depth of installationSet1                           
2Solar Panels 250watts Set8                                     
4Supply & Install Support Structure and frame for panels as in TSSNR1                                   
5Supply and Install 3X6mm2 pump motor cablesSet1                                   
6Supply and Install 4mm2 inter-connector cablesSet1                                       
7Supply and Install High pressure 2″ PVC riser piping (8bar) for pump installationm70                                       
8Supply and Install  level switchSet1                                           
7Provide and fix 16mm Marine rope to secure the pump meter70                                             
8Provide or construct a chamber as protector at the well head to secure the pump from vandalIzation. This can be in form of concrete or steel as specified by the engineerLumpsum1                                   
9Provide and install 6 feet copper earthen rodPiece1.0                                    
10Provide and install  copper lightening arresterPiece1.0
11Provide and fix 16mm lex of 15m length (made in Nigeria)Roll1.0
12Provide and fix scrotch cast connection for the borehole cablePiece1.0
13Provide and fix adjustable strap for cable tighteningpack1.0
14Provide and fix 16m cable lockPiece1.0
 Sub Total                    
      
 Anti-theft Mechanism on Wellbore
  Item DescriptionUnitQuantity Rate  AMOUNT (N) 
 Tile Metres38                                                             
 Over Head Tank 3000 Ltr Litres 2                                                         
 Sub Total Tiling                             
      
Summary – Mobilization                           
Summary – Construction of water collection point with ramp and rail for 2 units                         
Summary – Solar Installation 1,150 Watts System                       
Summary -Anti-theft Mechanism on Wellbore                         
Total        
BOQ FOR THE REHABILITATION OF MAFA SOLAR POWERED BOREHOLE IN MAFA LGA, WULARI BORNO STATE, NIGERIA.
 DESCRIPTION OF WORKSUNITQUANTITY COST  TOTAL COST 
1Mobilization and Demobilisation (Establishment of a base Station): Mobilization of all necessary materials, equipment, and all personnel to the base station for site clearance, borehole developments, pumping test and recovery tests, civil works, and installation of motorized pumps; including demobilisation of all Plants, Equipment’s and all resources from sits upon completion of installation works.Lumpsum1                                                                                                 –   
2Allow for data analysis and writing reports (Borehole completion reports, pump test report, installation report) in two hard copies and 1 electronic copy.Lumpsum1                                                                                                 –   
 Total carried to summary: MOBILIZATION    
      
CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL
AEARTH WORK    
1Site Clerance: Clear and and remove all tres, shrubs, and obstacle to be disposed 100m away from the site. m224.5                                                                                                 –   
2Excavate for the Foundation to receive concrete work not exceeding 700mm depthm35.23                                                                                                 –   
3Backfilling  to the sides of the excavated foundation footing using selected excavated materials to achieve maximum campaction ratio.m31.87                                                                                                 –   
4Remove surplus excavated material away from the sitem30.93                                                                                                 –   
5Excavation of soak pitnot exceeding 1.5m from natural ground level as specified on the drawingsm317.85                                                                                                 –   
6Provide hardcore material to the floor site of the water pointm29.4                                                                                                 –   
 SUBTOTAL                                                                                     –   
CONCRETE WORK    
1Provide and place 50mm thick plain concrete to ratio 1:3:6 grade 10 for foundation trench as specified on the drawing and specification.m30.85                                                                                                 –   
2Plastering/Rendering of water point using ratio 1:3m211.25                                                                                                 –   
3Ditto: Apronm35.66                                                                                                 –   
4 Provide mass cocrete to the ramp using ratio 1:3:6 m3              0.27                                                                                                  –   
5Reinforced concrete cover slab to ratio 1:2:4 grade 15m30.26                                                                                                 –   
6Ditto: Apronm20.5                                                                                                 –   
 SUBTOTAL                                                                                     –   
CREINFORCEMENT    
            1 High yield steel deformed bars to BS4449    
            2 Provide and fixed Y 12mm Ø reinforcement bar for soak pit slabKg37                                                                                                 –   
            3 Binding wireKg1                                                                                                 –   
 SUBTOTAL                                                                                     –   
 D FORMWORK    
            1  Provide 2″x4″ hard wood timber to the sides of slab  pcs               4.80                                                                                                  –   
            2  3″ assorted nails  kg               1.00                                                                                                  –   
 SUBTOTAL                                                                                     –   
EMASONRY WORK    
1 Provide and lay 230mm thick hollow blocks of 1:3 mix ratio  enbedded and jointed to cement sand mortar(1:4) to the perimeter and Apron of the water point ncluding ramp and 3 metre drainage channel connecting collection point and soak pit m2            17.92                                                                                                  –   
2 Sand cement plastering/rendering of 20mm thick, finished smooth: To internal & external fence walls. m2            12.87                                                                                                  –   
3 Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the soak pit allowing maximum of 3 opening to sides od the pit for proper seapage m2            14.20                                                                                                  –   
4 50mm thick concrete blinding to ratio 1:3:6 grade 10 for soak pit m3              0.31                                                                                                  –   
5 Block fill the block using week concrete m3              2.24                                                                                                  –   
 SUBTOTAL                                                                                     –   
FSTEEL WORK     
1Provide and fixed 1 1/4″ diameter pure black circular hand rail to the both sides of the ramp as shown on the drawingm            29.20                                                                                                  –   
 SUBTOTAL                                                                                     –   
F Plumbing work     
1Provide and fix UPVC 1″ UPVC tigger elbow Nr                     2                                                                                                  –   
2Provide and fix 3/4″ steel tap head England made or as specified by the engineer Nr                     6                                                                                                  –   
3 Provide and fix 3/4″ UPVC tigger nipple Nr                     6                                                                                                  –   
4Provide and fix 3/4″ UPVC tigger socket  Nr                     6                                                                                                  –   
5Provide and fix  1″ by 3/4″ Bushing England made or as specified by the engineer  Nr                     6                                                                                                  –   
6 Provide and fix 1″ UPVC tigger pipe in the collection point and extend aleast 2m away from the collection point  Nr                     2                                                                                                  –   
7 Provide and fix 1″ UPVC stop cork regulator at the collection point  Nr                     1                                                                                                  –   
 SUBTOTAL                                                                                     –   
Total carried to summary – CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL                                                                                    –   
 Total carried to summary – CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL FOR 2 UNITS 3                                                                                   –   
 Anti-theft Mechanism on Wellbore
  Item DescriptionUnitQuantity Rate  AMOUNT (N) 
 Tile Metres38  
 Solar Panels 250watts Metres4  
 Fencing Lumosom Lumpsom   
 Sub Total Tiling                                                                                      –   
Summary – Mobilization 
Summary – Construction of water collection point with ramp and rail for 2 units                                                                                  –   
Summary -Anti-theft Mechanism on Wellbore                                                                                  –   
Total                                                                                  –   
BOQ FOR THE REHABILITATION OF MAFA 2 SOLAR POWERED BOREHOLE IN MAFA CENTRAL PRIMARY SCHOOL LGA, BORNO STATE, NIGERIA.
 DESCRIPTION OF WORKSUNITQUANTITY COST  TOTAL COST 
1Mobilization and Demobilisation (Establishment of a base Station): Mobilization of all necessary materials, equipment, and all personnel to the base station for site clearance, borehole developments, pumping test and recovery tests, civil works, and installation of motorized pumps; including demobilisation of all Plants, Equipment’s and all resources from sits upon completion of installation works.Lumpsum1                                                                                                 –   
2Allow for data analysis and writing reports (Borehole completion reports, pump test report, installation report) in two hard copies and 1 electronic copy.Lumpsum1                                                                                                 –   
 Total carried to summary: MOBILIZATION    
      
CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL
AEARTH WORK    
1Site Clerance: Clear and and remove all tres, shrubs, and obstacle to be disposed 100m away from the site. m224.5                                                                                                 –   
2Excavate for the Foundation to receive concrete work not exceeding 700mm depthm35.23                                                                                                 –   
3Backfilling  to the sides of the excavated foundation footing using selected excavated materials to achieve maximum campaction ratio.m31.87                                                                                                 –   
4Remove surplus excavated material away from the sitem30.93                                                                                                 –   
5Excavation of soak pitnot exceeding 1.5m from natural ground level as specified on the drawingsm317.85                                                                                                 –   
6Provide hardcore material to the floor site of the water pointm29.4                                                                                                 –   
 SUBTOTAL                                                                                     –   
CONCRETE WORK    
1Provide and place 50mm thick plain concrete to ratio 1:3:6 grade 10 for foundation trench as specified on the drawing and specification.m30.85                                                                                                 –   
2Plastering/Rendering of water point using ratio 1:3m211.25                                                                                                 –   
3Ditto: Apronm35.66                                                                                                 –   
4 Provide mass cocrete to the ramp using ratio 1:3:6 m3                                                     0.27                                                                                                  –   
5Reinforced concrete cover slab to ratio 1:2:4 grade 15m30.26                                                                                                 –   
6Ditto: Apronm20.5                                                                                                 –   
 SUBTOTAL                                                                                     –   
CREINFORCEMENT    
            1 High yield steel deformed bars to BS4449    
            2 Provide and fixed Y 12mm Ø reinforcement bar for soak pit slabKg37                                                                                                 –   
            3 Binding wireKg1                                                                                                 –   
 SUBTOTAL                                                                                     –   
 D FORMWORK    
            1  Provide 2″x4″ hard wood timber to the sides of slab  pcs                                                      4.80                                                                                                  –   
            2  3″ assorted nails  kg                                                      1.00                                                                                                  –   
 SUBTOTAL                                                                                     –   
EMASONRY WORK    
1 Provide and lay 230mm thick hollow blocks of 1:3 mix ratio  enbedded and jointed to cement sand mortar(1:4) to the perimeter and Apron of the water point ncluding ramp and 3 metre drainage channel connecting collection point and soak pit m2                                                  17.92                                                                                                  –   
2 Sand cement plastering/rendering of 20mm thick, finished smooth: To internal & external fence walls. m2                                                  12.87                                                                                                  –   
3 Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the soak pit allowing maximum of 3 opening to sides od the pit for proper seapage m2                                                  14.20                                                                                                  –   
4 50mm thick concrete blinding to ratio 1:3:6 grade 10 for soak pit m3                                                     0.31                                                                                                  –   
5 Block fill the block using week concrete m3                                                     2.24                                                                                                  –   
 SUBTOTAL                                                                                     –   
FSTEEL WORK     
1Provide and fixed 1 1/4″ diameter pure black circular hand rail to the both sides of the ramp as shown on the drawingm                                                  29.20                                                                                                  –   
 SUBTOTAL                                                                                     –   
F Plumbing work     
1Provide and fix UPVC 1″ UPVC tigger elbow Nr                                                            2                                                                                                  –   
2Provide and fix 3/4″ steel tap head England made or as specified by the engineer Nr                                                            6                                                                                                  –   
3 Provide and fix 3/4″ UPVC tigger nipple Nr                                                            6                                                                                                  –   
4Provide and fix 3/4″ UPVC tigger socket  Nr                                                            6                                                                                                  –   
5Provide and fix  1″ by 3/4″ Bushing England made or as specified by the engineer  Nr                                                            6                                                                                                  –   
6 Provide and fix 1″ UPVC tigger pipe in the collection point and extend aleast 2m away from the collection point  Nr                                                            2                                                                                                  –   
7 Provide and fix 1″ UPVC stop cork regulator at the collection point  Nr                                                            1                                                                                                  –   
 SUBTOTAL                                                                                     –   
Total carried to summary – CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL                                                                                    –   
 Total carried to summary – CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL FOR 2 UNITS 3                                                                                   –   
 Anti-theft Mechanism on Wellbore
  Item DescriptionUnitQuantity Rate  AMOUNT (N) 
 Tile Metres38  
 Solar Panels 250watts Metres4  
 Water Reticulation Pipe pcs90  
 Sub Total Tiling                                                                                      –   
Summary – Mobilization                                                                                  –   
Summary – Construction of water collection point with ramp and rail for 2 units                                                                                  –   
Summary -Anti-theft Mechanism on Wellbore                                                                                  –   
Total                                                                                  –   

Method of Application

Quotations must be submitted via email to: [email protected] with the subject line: EYNPN/CAID/WASH/MAFA/TENDER/AUGUST/2025/0394 “Rehabilitation of Boreholes”.