Request for Quotes for the Rehabilitation Services at Ekklesiyar Yan’uwa a Nigeria (EYN PROJECT)

EYN Projects respects and believes in the infinite worth of every individual. We demonstrate this belief through our development and humanitarian services to affected communities, equal employment opportunities, building and strengthening staff’s skills, and ensuring qualitative and effective service delivery. EYN Projects does not discriminate based on gender, ethnicity, or religion in our recruitment exercise nor in our humanitarian and development work.

Experience3 years
Location Borno.

RFQ N0:  EYNPN/IOM/MMC/BOR/FEB/2025/0090 “REHABILITATION OF SOCIAL AND PRODUCTIVE INFRASTRUCTURES BASED ON COMMUNITY PREFERENCE IN SELECTED LOCATIONS (SOCIAL IMPACT PROJECT) ”

CLOSING DATE: 3rd March 2025, 5:00 PM

LOCATION: MMC

                                          ITEM / DISCRIPTION              UNIT    QUANTITY
Rehabilitation Of 3 Bedroom Fully Detached Flat with Waiting Area and Hall At Gidan Yara, Gidan MadaraLumpsum1
Rehabilitation Of 3 Bedroom Semi Detached Flat with Waiting AreaLumpsum1
Rehabilitation of 1 Block of 3 Classrooms and Painting of 1 Block Of 2 Classrooms at Gidan Yara, Gidan MadaraLumpsum1
Rehabilitation 0f 1 Block of 2 Rooms Kitchen at Gidan Yara, Gidan MadaraLumpsum1
Rehabilitation of 2 Block of Toilets at Gidan Yara, Gidan MadaraLumpsum1
Rehabilitation of Water Point at Gidan Yara, Gidan MadaraLumpsum1
Rehabilitation of one Bedroom Apartment at Gidan Yara, Gidan MadaraLumpsum1
    

To be considered, bidders should submit a completed request for quotation form and quotation on company’s letterhead not later than the closing date and time indicated above. Bidders     should ensure that the quotation is well written in English, easy to read, follows the instructions provided, and contains only requested information.

QUESTION: Any questions should be submitted in writing and emailed to [email protected] no later than three days after the issue date of this RFQ. No questions will be entertained if they are received by means other than the specified email address, and any communications to alternate e-mail addresses will result in the disqualification of the bidder.  The solicitation number (listed above) should be stated in the subject line. Answers will be compiled and distributed within 1 day from the closing date of questions

The Bidder is required to include details of three business references; this should include the name, company, and relationship to the bidder, email address, and / or phone number for each reference.

EYN Projects reserves the right to visit the place of business of a prospective supplier to verify that it is a legal business entity and has the necessary organizational and management competence to fulfill the necessary responsibilities.

  • All Bidders must provide proof of registration and tax. Attach CAC certificate and TIN when sending quotation.
  • All transportation and handling charges if any should be incorporated into vendor’s quoted unit price.

DISCLAIMER: – Brand Names: Specific brands and / or models indicated—while often preferred—are for description only.  An equivalent substitute, as determined by the specifications, will be acceptable.

The EYN projects estimate that the rehabilitation will be delivered within a period of 714 days. The selected bidder(s) should have the capacity to provide the services needed by EYN projects within the aforementioned timeframe. The consumption range provided is an estimate, and EYN projects reserves the right to consume above or below this range, or to order partial Items, and the selected bidder(s) shall deliver accordingly. The selected bidder(s) must deliver the services according to the provided timeline.

TENDER REQUIREMENTS:  – 

To ensure that best value is obtained the following would be considered;

  1. Evidence of Vendor’s registration with CAC, Tax Clearance Certificate and Identification Card (preferably NIN, International Passport or Voter’s card) of Company’ lead and Representation
  2. Acceptable quotation validity period
  3. Availability of items
  4. Delivery within specified time
  5. Not less than 3 years’ experience in similar services with Proof
  6. The quotation is applicable to 3% withholding tax and 1% Stamp duty.

EVALUATION CRITERIA: BEST VALUE: – Only quotations that meet the requirements above would be selected for evaluation. Please note that if there are significant deficiencies regarding responsiveness to the requirements of this RFQ, an offer may be deemed “non-responsive” and thereby disqualified from consideration. EYN Projects reserves the right to waive immaterial deficiencies at its discretion

 BOQ                                                                                REHABILITATION OF ONE BEDROOM APARTMENT AT GIDAN YARA, GIDAN MADARA
      
ISub Structure  Unit PriceTotal Amount
 Site Clearingm215.00  
 Excavation of strip foundation of 1m width, to a suitable depth not exceeding 1m.m12.00  
 Excavate column basem369.00  
 Treatment of foundation with anti termite Dieldrexm220.00  
 Blinding for Strip Foundation 50mm bedm30.60  
 Blinding for Column basesm30.70  
 Column Base Reinforcements, Y12kg250.00  
 StriprupsKg158.00  
 Instu Plain Concrete    
 Foundation Strip/Footingm31.00  
 Blockwork    
 Walls 230 Thickm215.00  
 Reinforced; Instu Vibrated Concrete Grade 25 – 1:2:4    
 Column Basesm31.00  
 Columnsm31.00  
 Bed not exceeding 150mm thickm32.50  
 Formwork    
 Edge of Columns, beams and slab bedm22.00  
 Laterite filling    
 Backfillingm315.00  
 Hardcore    
 150mm thickm315.00  
 Summary Substructure    
      
IISuper Structure    
 Blockwork    
 Walls 230 Thickm250.00  
 Reinforced; Instu Vibrated Concrete Grade 25 – 1:2:4    
 Columnm31.00  
 Lintelsm31.00  
 Roof Beamm31.00  
 Reinforcement for Columns, Lintel and roof beamsKg300.00  
 Formwork    
 Sides of Columns, beams and Lintelm21.00  
 Windows    
 Size 1200x1200mmNr4.00  
 Door    
 Size 1200x2100mmNr1.00  

III                    Roofing

2×6                                                                            m           50.00

2×4                                                                            m           90.00

2×3                                                                            m           150.00

2×2                                                                            m           180.00

Roof covering pitch 10 degrees, 0.20CGI Zinc       m²          108.00

Finishes

Renderwalls                                                             m2        120.00

TILES

400 x 400 x 8mm Royal tiles or equal and approved bedded and jointed in cement and sand mortar (1:3) on screeded bed (measured separately) and pointed

in white   cement .

8mm Tiles Paving                                                     m2         46.00

100mm Skirting                                                        m           45.00

PAINTING AND DECORATING  FinecoatProducts orEqual Prepareand apply twocoats of emulsion paints onWallm2         136.00  

IV

 Ceilingm265.00  
VElectricals:    
 Allow provisional sum ofLsum1  
      
VIBuilder’s works     
 
 Allowfor builder’s works in connection with all works in this sectionsum1  
  
 Summary Superstructure 
  
GRAND TOTAL 
 BOQREHABILITATION OF 1 BLOCK OF 2 ROOMS KITCHEN AT GIDAN YARA, GIDAN MADARA
      
    UNIT PRICETOTAL PRICE
IFLOOR FINISHES    
 Cement and Sand (1:3) Beds &backing    
 42mm screeded bedding to Floorm245.00  
 12mm backing to smooth finishm245.00  
      
IIDOORSAND WINDOWS    
 Supply and fix purpose made steel doors with complete with locks and frames    
 Size 900 X 2100mm highNr2.00  
 WINDOWS    
 Supply and fix seethrough or fancy blocks      
 Size 100 x 200mmNr40.00  
      
IIICOOKING AREA    
 Allow Provisional sum for fixing of cooking areaLS1.00  
      
IVROOFCOVERING    
 Replace roofing sheetsBundle1.00  
      
VPAINTING AND DECORATING    
 Finecoat Products or Equal    
 Prepare and apply two coatsof emulsion paints on    
 Wall (External )m280.00  
 Wall (Internal Halfway)m280.00  
 Oil Paint    
      
 Prepare and apply two coatsof oil paints on    
 Wall (Halfway)m280.00  
      
      
VIELECTRICAL    
 Allow a provisional sum for electrical fittingsLS1.00  
     
VIIBuilder’s works    
 Allowfor builder’s works in connection with all works in this section sum 1  
GRAND TOTAL₦
PRICING DOCUMENTREHABILITATION OF 1 BLOCK OF 3 CLASSROOMS  ANDPAINTING OF 1 BLOCK OF 2CLASSROOMS  AT GIDAN YARA, GIDAN MADARA 
 
    UNIT PRICETOTAL AMOUNT 
IFLOOR FINISHESCement and Sand (1:3) Beds & backing    
     
 42mm screeded bedding to Floorm2 m230.00  45.00   
 12mm backing to smoothfinish   
       
IIWINDOWS WINDOWS     
     
 Supply and fix glass on window Frame     
 Size 600 x 1200mmNr2.00   
     
IIIROOFCOVERINGSupply and Fix Ceiling     
m260.00   
     
IVSTEPS AND RAMPRepair and fix steps and ramp     
     
 Steps     
 size 300 x 1000mmLS1.00   
 Ramp   
 Size 600 x 1000mmLS1.00   
     
VIPAINTING AND DECORATING Finecoat Products or Equal     
     
 Prepare and apply two coatsof emulsion paints on     
 Wallm2850.00  
      
VELECTRICAL    
 Allow a provisional sum for electrical fittingsLS1.00  
     
VIBuilder’s works    
 Allow for builder’s works in connection with all works in this section sum 1  
GRAND TOTAL₦
BOQREHABILITATION OF 2 BLOCK OF TOILETS AT GIDAN YARA,GIDAN MADARA
IFLOOR FINISHES    
 Cement and Sand (1:3) Beds & backing    
 42mm screeded bedding to Floorm260.00  
 300x300mmTilesm240.00  
 Wallm220.00  
      
IIWINDOWS AND DOORS    
 Windows    
 Supply and install purpose madesteel window       
 Size 600 x 600mmNr4.00  
 Doors    
 Supply and install purpose madesteel doors       
 Size 900 x 2100mmNr4.00  
IVSTEPS AND RAMP    
 Repair and fix steps and ramp    
 Steps    
 size300 x 1000mmLS1.00  
 Ramp    
 Size 600 x 1000mmLS1.00  
      
VIPAINTING AND DECORATING    
 Finecoat Productsor Equal    
 Prepare and apply two coats of emulsion paints on    
 Wallm2180.00  
 Ceilingm230.00  
      
 PLUMBING AND SANITARY FITTINGS    
 Allow for water connection to ToiletLs Nr1.00  
 Supply and installsquat water closet, washhand basinand all accessories 4.00  
     
VELECTRICAL    
 Allow a provisional sum for electricalfittingsLS1.00  
     
VIBuilder’s works    
 Allow for builder’s works in connection with all works in this section sum 1  
GRAND TOTAL₦

BOQ

REHABILITATION OF3 BEDROOM FULLY DETACHED FLAT WITH WAITNG AREA AND HALLAT GIDAN YARA, GIDAN MADARA

I                      FLOOR FINISHES AND WALL TILES

Carefully Chiesel through surface of existing concrete floor to fix new tiles

m2         9.00

400 x 400 x 8mm Royal tiles or equal and approved   bedde d and  jointed in cement and sand mortar (1:3) on screeded bed (measured separately) and pointed in white   cement . 

8mm Tiles Paving                                                      m2         158.00

100mm Skirting                                                        m           231.00

Cement and Sand (1:3) Beds & backing

42mm screeded bedding to Quarry tiles                   m2         158.00

12mm backing toskirting                                         m           231.00

Wall Tiles at Toilet                                                   m2         40.00

II                     DOORS AND WINDOWS

Supply and fix wooden panel flush door for rooms and Turkish Door for entrance with complete  with  locks and frames 

Size 900 X 2100mm high                                          Nr         6.00

Size 1200 x 2100 in two openings leaves                 Nr          1.00

 Fix exit door to Kitchen handlesNr1.00  
 WINDOWS     
 
 Supply and fix purpose made steel mosquitoes Nets    
 
 Size 1200 x 1200mmNr16.00  
 Size 1800 x 600mmNr3.00  
 Fix lovures glasses (200x800mm)Nr15.00  
      
IIIWARDROPES     
 
 Supply and Fix MDF wood or equivalent     
wardropes 
 
 Size 1800 x 2100mmNr1.00  
 Size 1400 x 2100mmNr1.00  
      
IVWASTE DISPOSAL     
 
 Carefully break existing inspection chamber and disposeLS1.00  
   Construct 1 x 1 x2m chamber (using 6″ blocksand block fill with lightconcrete – 1:6) plastered in and out. Also, install fabricated cover of 3mmthick guage properly treated with anti-rust paint and install a big high quality steel pad locks. (sanitary seal)    LS    1.00  
      
VROOF COVERING     
 
 Check for possible leaking and fixLS1.00  
 Replace ceiling boardm250.00  
           
      
VIPAINTINGAND DECORATING     
 
 Finecoat Products or Equal     
 
 Prepare and apply two coats of emulsion paints    
on 
 
 Wallm2520.00  
 Ceilingm2350.00  
      
 PLUMBING AND SANITARY FITTINGS    
 Supply and install water closet with wash hand basin at Director’s officeNr1.00  
 Supply and install squat water closet, wash hand basin and all accessoriesNr2.00  
      
VIIELECTRICAL     
 
 Allow a provisional sum for electrical fittingsLS1.00  
     
 PVC CEILING    
 Supply and Fix PVc Ceiling at Entrancem2180.00  
      
 OFFICEFURNITURE    
 Supply Standard Office Chair and Table forDirector’s officeLs Ls LsNr1.00  
 Supply and Install 42” Television1.00  
 Supply and Install a decoder Free to Air1.00  
 Supply and Install a 3 seater stainless steel chairs3.00  
          
      
VIIIBuilder’s works     
 
 Allow for builder’s works in connection with all works in this sectionsum1  
GRAND TOTAL₦
 BOQREHABILITATION OF 3 BEDROOM SEMI DETACHED FLAT WITH WAITNG AREA 
 
       
IDOORS AND WINDOWSSupply and fix wooden panel flushdoor for rooms and Turkish Door for entrance with complete with locks and frames     
     
 Size 900 X 2100mm highNr Nr5.00 1.00   
 Size 1200 x 2100 in two openings leaves   
 WINDOWS     
 Supply and fix purpose made steel mosquitoes Nets     
 Size 1200 x 1200mmNr Nr16.00 3.00   
 Size 1800 x 600mm   
       
IIINFANT BEDS     
     
 Fix broken beds Paint All infant beds using an approved oil paintNr Nr5.00 10.00   
    
       
IIIKITCHEN CABINETSSize 600 x 1200 x 5000mm     
Nr Nr1.00 1.00   
 Size600 x 1200 x 2000mm   
IVPAINTING AND DECORATING    
 Finecoat Products or Equal    
 Prepare and apply two coatsof emulsion paints on    
 Wallm2820.00  
      
 Ceilingm2450.00  
      
VOFFICEFURNITURE    
 Supply Standard Office Chair and Table for 2 officesLs1.00  
      
      
VIELECTRICAL    
 Allow a provisional sum for electrical fittingsLS1.00  
     
VIIBuilder’s works    
 Allowfor builder’s works in connection with all works in this section sum 1  
GRAND TOTAL₦
PRICING DOCUMENTREHABILITATION OF WATERPOINT AT GIDAN YARA,GIDAN MADARA
      
IPLUMBIMG WORKS  UNIT PRICETOTAL AMOUNT
      
 Supply  and install  15 length  of 1 1/4″ PVC pipe  (tiger  made),10  pcs  of  PVC  elbow,  3  pcs  of  PVC  Tee,  4  pcs  of  PVC  gate valve  for washouts  and outlets  to the storage  reserviour.  This include cost of materials and labourfor installations.  LS  1.00  
 Construct a water collection point 2.5 X 3.0 X 1m, (LxBxH) plastered  completely  and install  2nos  1 1/4 “GI outlet  and a purpose  made  hanger  for  the  flexible  horse  tobe  hung.  Also supply  and install a 5m length  1 1/2″flexible  horse.  Note: the concrete platform for the water collection point should be compacted in layers of 0.15m laterite soil, boulders with 6″ concrete  thickness  (1:3:6,  aggregate  (2″  granite)),  sloping  at least  0.1m.  lay  one  course  of  9”  blocks  at  the  two  sides  and install two (2) purpose  made hangers  and plaster accordingly. The mansory stand for water outlets is 1m height.      LS      1.00  
 Supply all required materials and construct a 4meter length drainage  using   6″ hollow  blocks  to be laid in parrallel  6 inch apart,  every  line should  have   2 courses  of blocks  jointed  with cement  sand  mortar  (1:6)  embeded  on 50mm  blinding  as its foundation.      Internal     and    external    plastering      should    be applied    with   proper   dressing.This  is  to   connect    collection point to an existing drainage.    LS    1.00  
 Construct   1 x 1 x 1m chamber   (using  6″ blocks  andblock  fill with light concrete – 1:6) plastered in and out. Also, install  fabricated    cover  of  3mm  thick  guage  properly    treated  with anti-rust  paint  and    install  a big high  quality  steel  pad   locks. (sanitary seal)  LS  1.00  
  Excavate    an  area  2x2m  not  exceeding    0.9m,  blind  properly  with  6″ mass  concrete  (1:3:6).  Construct  a concrete  Platform2.3  x 2.3  x 3 m  (LXBXH).  Using  9″  concrete  blocks  embeded with    colums   and   basket   (0.6×0.6m    ,Bottom)    @  2.3    meter centers  with  ground  and  top  beams  respectively. Filled  with lateritic  earth  materials   compacted   in  layers  of  0.3m  fillled with   boulders    and   layed   with    150    mm   (6″)   of   concrete thickness with steel bars 10mm diameter every 30cm with a concrete  cover  at the  top and buttom.  Also  plaster  the   entire  structure.  Install  4nos of a purpose  made hooks   using  12mm rod  as  support  for  ancoring  the  tank.  Note concrete  shouldcontain 3″ granite as gravel .       Ls       1.00  
 Supply  and installation  of 5000  liters  PVC GEEPEE    tank  withcomplete     assessories     for   the    connections.  Note:   the   tank should  be  anchored  to  the  hooks  using  8   mm  rod  to   avoid wind effect  Ls  1.00  
      
      
GRAND TOTAL₦
       RFQ # EYNPN/IOM/MMC/BOR/FEB/2025/0090 
 
Request For Quotation (RFQ)Programs Requisition                                            Date Prepared:  17/Feb/2025  
  
     
Vendor Name: Vendor’s Address:       
       
Mobile Number:       
Contact Person:       
Delivery Date:       
Delivery Location:MMC 
  
 Activity Title: Budget Code: REHABILITATION OF SOCIAL AND PRODUCTIVE  INFRASTRUCTURES BASED ON COMMUNITY PREFERENCEIN SELECTED LOCATIONS (SOCIAL IMPACT PROJECT) 
 
  ription and Specification (Be specific as possible ) Unit of Measure  Lumpsum Qty            Freq  1                 1 Est Unit Cost Est total  NGN                                   – 
 1  
 2   Lumpsum 1                 1  NGN                                   – 
 3 Rehabilitation of 1 Block of 3 Classrooms and Painting of 1 Block Of 2 Classrooms atGidan Yara, Gidan Madara Lumpsum 1                 1  NGN                                   – 
 4 Rehabilitation 0f 1 Block of 2 Rooms Kitchen at Gidan Yara, Gidan Madara Lumpsum 1                 1  NGN                                   – 
 5 Rehabilitation of 2 Block of Toilets at Gidan Yara, Gidan Madara Lumpsum 1                 1  NGN                                   – 
 6 Rehabilitation of Water Point at Gidan Yara, Gidan Madara Lumpsum 1                 1  NGN                                   – 
 7 Rehabilitation of one Bedroom Apartment at Gidan Yara, Gidan Madara Lumpsum 1                 1  NGN                                   – 
    Estimated Total:NGN                                   – 
Note: Please submit your qoutation offer on or before the closingdate                                      End Date: 3/Mar/2025    
         
 To be completed  byvendor Validaty period of quoatation  (in days, Weeks) : 
 
How many days, can you deliver after PO is received) : 
Warrantee  Period ( In weeks or Year(s) : 
Disclaimer: I vendor, certify that information provided by my company are true, accurate and free of error and valid 
Name of Company Representative: 
  Signature  with company  stamp here: 
 Date :                                                                                  

Method of Application

Quotations must be submitted in a sealed brown envelope to the designated bid box at the EYN Projects Office at Old GRA, No 1 Madura street, Old Doctors Quarters, Maiduguri, Borno State, Nigeria. Or via email to: [email protected] with the subject line:  “ RFQ N0:  EYNPN/IOM/MMC/BOR/FEB/2025/0090 “REHABILITATION OF SOCIAL AND PRODUCTIVE INFRASTRUCTURES BASED ON COMMUNITY PREFERENCE IN SELECTED LOCATIONS (SOCIAL IMPACT PROJECT) ”

Share this job:
Facebook Twitter LinkedIn Email Print